Services
Coffs Harbour Medical Centre – Design and documentation of mechanical,
electrical and hydraulic services for a3 storey, 6000m² medical centre. Sustainability
measures include:
• Energy Recovery Air Conditioning to common spaces
• Heat Recovery Air Conditioning to tenancies
• High Efficiency Lighting
• Solar Hot Water
• Stormwater recovery and reuse
Medical Centre, Park Beach Plaza
McAuley Catholic College
Manning Valley Anglican College
Park Beach Plaza:
• Tenancy Fitouts Section J.
• Ensuring each tenancy within the shopping centre meets the energy
efficiency requirements of the BCA.
Coffs Harbour Airport Chiller upgrade.
• Upgrade of air cooled chiller to a far more energy efficient water cooled
version. Also incorporated measures to extend chiller life by separating it
from the highly corrosive external environment.
Sapphire Beach Redevelopment – AS/NZS 3000 Reticulation

Our Work